pmo: dispatch final design closure
This commit is contained in:
@@ -156,3 +156,9 @@
|
||||
|
||||
- Experience R5 attempt-1 used zsh special variable `path` in its first archive-verification harness and failed before source judgment, then continued after PMO STOP. Classify the whole attempt INVALID and archive HAPI `c52000b5-2021-48cb-8d68-299f36876b8c`.
|
||||
- Its assigned worktree remained clean at `e4ef2b0`; no product judgment or repository write is reusable. Automatically create one fresh replacement reviewer on the same immutable source and unchanged read-only Goal.
|
||||
|
||||
# 2026-08-11 - Final Design Package Closure
|
||||
|
||||
- Owner explicitly prioritizes fast completion of the complete pre-development product package and final reviewable output, not engine implementation.
|
||||
- Preserve Experience R5 Gates 1-7 PASS and repair only its earliest real blocker: exact `RG-01..08` to `ART-REG-01..08` production mapping plus validator regression coverage.
|
||||
- In parallel, replace the superseded 82-screen coverage audit with the current-authority 50-state landscape HTML prototype. No engine, bulk final media, packaging or release work is authorized.
|
||||
|
||||
@@ -53,7 +53,7 @@
|
||||
| Pre-dispatch recovery | Identity/runtime failure before ACK with clean worktree and zero Goal edits is PMO-owned recovery, not a product attempt; retry automatically while runtime/scope/model/permission/cost remain unchanged |
|
||||
| Monitoring wait primitive | HAPI completion/blocker event + real timer cell; startup 90s, steady 600s; resume only with functions.wait(real cell_id) |
|
||||
| Monitoring observe primitive | inspect_peer/session metadata/messages + exact task ledger reconciliation |
|
||||
| Monitoring target evidence | Systems R5 HAPI `a0ea4f06-a73d-47c4-bc0d-dad36c6d735d` archived after invalid review-contract terminal; Experience R5 A2 HAPI `2392ec4d-83e8-4df4-b06e-0a7d3fa8167b` active |
|
||||
| Monitoring target evidence | R5 reviewers archived; pending HAPI dispatch for region-art R6 and final-prototype R6 |
|
||||
|
||||
## 共享文件锁
|
||||
|
||||
|
||||
@@ -1,6 +1,6 @@
|
||||
# 角色注册表
|
||||
|
||||
> Team revision: `rev-12`
|
||||
> Team revision: `rev-13`
|
||||
|
||||
| Role ID | 名称 | 生命周期 | 状态 | 核心职责 | 当前 Goal | Session ID | 最后更新 |
|
||||
|---|---|---|---|---|---|---|---|
|
||||
@@ -25,7 +25,9 @@
|
||||
| design-validator-r5-h2-a3 | R4 矛盾回归验证工程师(握手恢复) | task-scoped | retired | 为 seed/事务与隐藏职业美术绑定建立语义正负回归门 | task:ABG-V2-R4-VALIDATOR-H2 | 1546960c-baf0-4a36-bd71-b1c39bc577b7 (archived) | 2026-08-11 |
|
||||
| systems-integrity-reviewer-r5 | 系统完整性独立复审员 R5 | task-scoped | retired | 固定源核心循环、战斗、经济、节奏、存档、失败与机械内容一致性 | task:ABG-V2-SYSTEMS-REVIEW-R5 | a0ea4f06-a73d-47c4-bc0d-dad36c6d735d (archived) | 2026-08-11 |
|
||||
| experience-production-reviewer-r5 | 体验与生产独立复审员 R5 | task-scoped | retired | 固定源可理解性、页面覆盖、美术音频生产、可访问性与原创性 | task:ABG-V2-EXPERIENCE-REVIEW-R5 | c52000b5-2021-48cb-8d68-299f36876b8c (archived INVALID) | 2026-08-11 |
|
||||
| experience-production-reviewer-r5-a2 | 体验与生产独立复审员 R5 替代 | task-scoped | assigned | 固定源可理解性、页面覆盖、美术音频生产、可访问性与原创性 | task:ABG-V2-EXPERIENCE-REVIEW-R5 | 2392ec4d-83e8-4df4-b06e-0a7d3fa8167b | 2026-08-11 |
|
||||
| experience-production-reviewer-r5-a2 | 体验与生产独立复审员 R5 替代 | task-scoped | retired | 固定源可理解性、页面覆盖、美术音频生产、可访问性与原创性 | task:ABG-V2-EXPERIENCE-REVIEW-R5 | 2392ec4d-83e8-4df4-b06e-0a7d3fa8167b (archived) | 2026-08-11 |
|
||||
| region-art-binding-repairer-r6 | 区域内容到美术生产绑定修复员 | task-scoped | reserved | 对齐 RG-01..08 与 ART-REG-01..08,并补语义回归门 | task:ABG-V2-REGION-ART-BINDING-R6 | PENDING | 2026-08-11 |
|
||||
| final-prototype-builder-r6 | 最终横屏 HTML 原型制作员 | task-scoped | reserved | 将当前 50 页面、8 区域和完整目录实现为 Owner 可审的 Gallery 原型 | task:ABG-V2-FINAL-PROTOTYPE-R6 | PENDING | 2026-08-11 |
|
||||
|
||||
## 编制变更历史
|
||||
|
||||
@@ -43,3 +45,4 @@
|
||||
| 2026-08-11 | rev-10 | 将零编辑 pre-dispatch 身份失败改为 PMO 自动恢复 | Owner:`你继续啊,为什么一直要我授权` | 新建握手恢复角色;两阶段 dispatch;不消耗产品 Goal 尝试 |
|
||||
| 2026-08-11 | rev-11 | H2 整合后新增两个 fresh R5 独立 reviewer | 既有 Owner 最多 10 个可见会话及双 reviewer 授权 | 两个只读角色并行审同一固定源;双 PASS 才进入 synthesis |
|
||||
| 2026-08-11 | rev-12 | Experience R5 首次 harness INVALID 后自动替换 | PROJECT pre-dispatch/reviewer environment recovery policy | 原 reviewer 归档;fresh a2 仍只读同一固定源 |
|
||||
| 2026-08-11 | rev-13 | Experience R5 Gate 8 后并行区域绑定修复与最终 HTML 制作 | Owner 要求尽快完成完整策划、美术与可查看输出;既有最多 10 个可见会话授权 | 两个写入域互斥;不进入引擎开发或最终媒体生产 |
|
||||
|
||||
@@ -28,7 +28,9 @@
|
||||
| ABG-V2-HIDDEN-PROFESSION-ART-REPAIR | 隐藏职业内容到美术绑定修复 | review | hidden-profession-art-repairer-r5 | 2/2 | 2026-08-11T11:58:55+08:00 | `fef9057` -> `8102bd2` 已整合;`c558d19` 禁止;等待 H2 + fresh Experience R5 |
|
||||
| ABG-V2-R4-VALIDATOR-H2 | R4 seed/事务与隐藏职业绑定回归门 | done | design-validator-r5-h2-a3 | product 1/2; dispatch recovery 3 | 2026-08-11T13:06:00+08:00 | candidate `fb20b66` 整合为 `7dc584d`;24 cases/errors=0/JSON/5 seeds 通过;等待 R5 双审 |
|
||||
| ABG-V2-SYSTEMS-REVIEW-R5 | 系统完整性固定源复审 | failed | systems-integrity-reviewer-r5 | 1/1 | 2026-08-11T13:25:00+08:00 | reviewer Gate 1-8 PASS;Gate 9 使用错误时长 Goal,PMO 分类 INVALID_REVIEW_CONTRACT;Gate 10 未审 |
|
||||
| ABG-V2-EXPERIENCE-REVIEW-R5 | 体验与生产固定源复审 | active | experience-production-reviewer-r5-a2 | product judgment 0/1; environment recovery 2 | 2026-08-11T13:26:00+08:00 | full fixed-source read-only Goal 已发送;等待终态 |
|
||||
| ABG-V2-EXPERIENCE-REVIEW-R5 | 体验与生产固定源复审 | failed | experience-production-reviewer-r5-a2 | product judgment 1/1; environment recovery 2 | 2026-08-11T13:48:00+08:00 | Gates 1-7 PASS;Gate 8 FAIL:ART-REG 未绑定 RG 且序号简报冲突;9-10 未提升 |
|
||||
| ABG-V2-REGION-ART-BINDING-R6 | 区域美术绑定收口 | inbox | region-art-binding-repairer-r6 | 1/1 | 2026-08-11T13:50:00+08:00 | worktree `repair-region-art-r6` 已固定;等待 HAPI 派发 |
|
||||
| ABG-V2-FINAL-PROTOTYPE-R6 | 最终横屏 HTML/Gallery 原型 | inbox | final-prototype-builder-r6 | 1/1 | 2026-08-11T13:50:00+08:00 | worktree `final-prototype-r6` 已固定;等待 HAPI 派发 |
|
||||
|
||||
## 批次
|
||||
|
||||
|
||||
+6
-5
@@ -4,7 +4,7 @@
|
||||
|---|---|
|
||||
| 任务 ID | ABG-V2-EXPERIENCE-REVIEW-R5 |
|
||||
| Goal ref | task:ABG-V2-EXPERIENCE-REVIEW-R5 |
|
||||
| Goal current path | queue/active/ABG-V2-EXPERIENCE-REVIEW-R5/goal.md |
|
||||
| Goal current path | queue/failed/ABG-V2-EXPERIENCE-REVIEW-R5/goal.md |
|
||||
| Context manifest | context.md |
|
||||
| Context revision | 2 |
|
||||
| Role ref | role:experience-production-reviewer-r5-a2 |
|
||||
@@ -15,11 +15,11 @@
|
||||
| Reviewer Role profile | roles/experience-production-reviewer-r5/ROLE.md |
|
||||
| Frozen spec | .agent-taskgraph/spec.md design-spec-r3 |
|
||||
| Graph node | .agent-taskgraph/graph.yaml#v2_experience_review_r5 |
|
||||
| 状态 | active |
|
||||
| 状态 | failed |
|
||||
| 负责人 | experience-production-reviewer-r5-a2 |
|
||||
| 轮次 | 1/1 |
|
||||
| 最后更新 | 2026-08-11T13:26:00+08:00 |
|
||||
| 验收结果 | PENDING |
|
||||
| 最后更新 | 2026-08-11T13:48:00+08:00 |
|
||||
| 验收结果 | FAIL Gate 8 unresolved region-to-art production binding |
|
||||
| Runtime requested | runtime=hapi; flavor=codex; model=gpt-5.6-sol; effort=xhigh; permission=yolo; visibility=visible |
|
||||
| Runtime observed | runtime=hapi; flavor=codex; model=gpt-5.6-sol; effort=xhigh; permission=yolo; visibility=visible |
|
||||
| Runtime verification | VERIFIED; zero-message pre-dispatch; verification d8fd2785-752f-4150-999e-8b0d39a544e6 |
|
||||
@@ -28,7 +28,7 @@
|
||||
| Dispatch bootstrap | dispatch.md |
|
||||
| Dispatch message | PHASE2_SENT: full fixed-source Goal via HAPI 2392ec4d at 2026-08-11T13:26:00+08:00 |
|
||||
| Identity ACK | VERIFIED exact standalone rev-12 ACK before review commands |
|
||||
| 等待归属 | Experience reviewer: PASS/FAIL/INVALID terminal |
|
||||
| 等待归属 | region-art-binding-repairer-r6 |
|
||||
|
||||
## State History
|
||||
|
||||
@@ -43,3 +43,4 @@
|
||||
| 2026-08-11T13:20:00+08:00 | inbox -> inbox | PMO | fresh HAPI 2392ec4d pre-dispatch VERIFIED; exact runtime and zero-message watermark | commit binding then send identity-only bootstrap |
|
||||
| 2026-08-11T13:25:00+08:00 | inbox -> active | PMO | exact rev-12 ACK observed twice; worktree clean at 7ca0619 | commit activation then send full read-only Goal |
|
||||
| 2026-08-11T13:26:00+08:00 | active -> active | PMO | full fixed-source read-only Goal delivered | observe until earliest terminal |
|
||||
| 2026-08-11T13:48:00+08:00 | active -> failed | PMO | Gates 1-7 PASS; ART-REG packages lack exact RG mapping and several briefs conflict | dispatch bounded R6 repair |
|
||||
@@ -0,0 +1,19 @@
|
||||
# ABG-V2-EXPERIENCE-REVIEW-R5 Report
|
||||
|
||||
Terminal: `ABG-V2-EXPERIENCE-REVIEW-R5 FAIL: Gate 8 unresolved region-to-art production binding`
|
||||
|
||||
- Fixed source: `69f6715b6f47b507fb07436ee1edf77df7e5adab`
|
||||
- Fixed tree: `f9e8f4b9`
|
||||
- Reviewer: HAPI `2392ec4d-83e8-4df4-b06e-0a7d3fa8167b` (archived)
|
||||
- Archive: 293 tracked files; reviewer worktree clean at `7ca0619`
|
||||
- Validator: `cases=24`, `errors=0`, byte-identical repeated JSON
|
||||
|
||||
Gates 1-7 passed, including the two-of-four opening, all 50 states, the
|
||||
horizontal ten-member line, generated-Recruit art fields, and both hidden-
|
||||
profession negative mutations. Gate 8 found that `ART-REG-01..08` are
|
||||
countable but are not explicitly bound to `RG-01..08`; several ordinal briefs
|
||||
describe different biomes from the matching content IDs. Gates 9-10 were not
|
||||
promoted after the earliest failure. The reviewer made no repository writes.
|
||||
|
||||
Shortest repair: bind every art region package to one exact content region,
|
||||
align the brief, and add validator negative coverage for missing/wrong mapping.
|
||||
@@ -0,0 +1,10 @@
|
||||
# Context Manifest: ABG-V2-FINAL-PROTOTYPE-R6
|
||||
|
||||
> Task ID: `ABG-V2-FINAL-PROTOTYPE-R6`
|
||||
> Revision: `1`
|
||||
> Mode: `balanced`
|
||||
|
||||
Read Role, PROJECT, this Goal, current product contract, `SCREEN_AND_STATE_MAP`,
|
||||
`UI_AND_VISUAL_SYSTEM`, current content index/catalogs, current art/audio
|
||||
catalogs and the prototype spec. Existing HTML is implementation input only,
|
||||
never current authority. Use search and parsers instead of copying whole docs.
|
||||
@@ -0,0 +1,19 @@
|
||||
# Dispatch Bootstrap: ABG-V2-FINAL-PROTOTYPE-R6
|
||||
|
||||
| Field | Value |
|
||||
|---|---|
|
||||
| Task ID | ABG-V2-FINAL-PROTOTYPE-R6 |
|
||||
| Dispatch ID | dispatch:ABG-V2-FINAL-PROTOTYPE-R6:attempt-1 |
|
||||
| Role ref | role:final-prototype-builder-r6 |
|
||||
| Role profile | roles/final-prototype-builder-r6/ROLE.md |
|
||||
| Role lifecycle | task-scoped |
|
||||
| Team revision | rev-13 |
|
||||
| Goal ref | task:ABG-V2-FINAL-PROTOTYPE-R6 |
|
||||
| Context manifest | context.md |
|
||||
| Context revision | 1 |
|
||||
| Continuity | Replace superseded coverage audit from current design authorities. |
|
||||
| Session ID | PENDING |
|
||||
| Expected identity ACK | IDENTITY_READY dispatch_id=dispatch:ABG-V2-FINAL-PROTOTYPE-R6:attempt-1 role=role:final-prototype-builder-r6 team_revision=rev-13 goal=task:ABG-V2-FINAL-PROTOTYPE-R6 context_revision=1 |
|
||||
| Delivery | NOT_SENT |
|
||||
| Identity ACK | PENDING |
|
||||
| ACK evidence | PENDING |
|
||||
@@ -0,0 +1,48 @@
|
||||
# Goal: ABG-V2 Final Landscape Prototype R6
|
||||
|
||||
> Stage: owner-facing final pre-development output
|
||||
> Task ID: `ABG-V2-FINAL-PROTOTYPE-R6`
|
||||
> Baseline: `fcc63a0a3a18594a8cccdf9c7fe238ff9fda9a2b; branch=feature/abg-v2-final-prototype; clean`
|
||||
> Product authority: `69f6715b6f47b507fb07436ee1edf77df7e5adab` plus current PMO-only history
|
||||
> Frozen spec: `.agent-taskgraph/spec.md design-spec-r3`
|
||||
> Context manifest: `context.md`
|
||||
> Context revision: `1`
|
||||
> Legal terminal: **ABG-V2-FINAL-PROTOTYPE-R6 candidate ready** or **redesign required: <earliest owner-visible boundary>**
|
||||
|
||||
## Objective
|
||||
|
||||
Replace the superseded 82-screen coverage audit with one polished, responsive,
|
||||
owner-reviewable landscape HTML prototype that faithfully renders the current
|
||||
50 page/state authority and complete game design. It must look like game
|
||||
screens, not specification cards, and expose one page at a time with spacious
|
||||
navigation and full-canvas viewing.
|
||||
|
||||
## Writes
|
||||
|
||||
- `prototype/site/**`
|
||||
- `prototype/gallery/**`
|
||||
- `tools/build_gallery_bundle.py`
|
||||
- `README.md`
|
||||
- `docs/prototype/INTERACTIVE_PROTOTYPE_SPEC.md`
|
||||
|
||||
## Acceptance
|
||||
|
||||
- Exactly 50 current screen/state IDs, no retired 82-screen/30-character claims, no missing-UI placeholders.
|
||||
- Dedicated player-readable compositions for the six Owner review groups: opening two-of-four/run creation, Market hire, formation/equip, horizontal battle, result/reward/recovery, catalog/settings.
|
||||
- Every remaining state has a faithful page-specific composition or explicit state variant, not a generic spec card.
|
||||
- Eight region/chapter views and searchable 42 professions, 36 traits, 320 equipment, 60 artifacts, 100 enemies, 16 bosses.
|
||||
- Landscape game canvas is fully visible on desktop, tablet, phone portrait and phone landscape; left nav becomes an ergonomic drawer on narrow screens; no overlap/crop.
|
||||
- Real interactions cover the first-play chain, page switching, search/filter, previous/next, full-screen/zoom, EN/zh_CN and accessibility/settings states.
|
||||
- Existing concept boards are used only as labeled visual direction; no paid generation or commercial assets.
|
||||
- Build a self-contained Gallery bundle. Run deterministic content checks and Playwright screenshots at desktop plus phone portrait/landscape; inspect screenshots and report paths.
|
||||
- Focused commit is pushed; branch tracks upstream and worktree is clean.
|
||||
|
||||
## Frozen
|
||||
|
||||
No changes to `docs/product`, `docs/content`, `docs/presentation`, final/bulk
|
||||
media, engine code, packaging or release. This is a design prototype, not a
|
||||
playable build.
|
||||
|
||||
- Role ref: `role:final-prototype-builder-r6`
|
||||
- Worktree: `/Users/wusumac/Documents/game/tmp/aetherbound-guild-worktrees/final-prototype-r6`
|
||||
- Runtime: HAPI Codex `gpt-5.6-sol / xhigh / yolo`, PENDING
|
||||
@@ -0,0 +1,31 @@
|
||||
# Ledger: ABG-V2-FINAL-PROTOTYPE-R6
|
||||
|
||||
| Field | Value |
|
||||
|---|---|
|
||||
| 任务 ID | ABG-V2-FINAL-PROTOTYPE-R6 |
|
||||
| Goal ref | task:ABG-V2-FINAL-PROTOTYPE-R6 |
|
||||
| Goal current path | queue/inbox/ABG-V2-FINAL-PROTOTYPE-R6/goal.md |
|
||||
| Context manifest | context.md |
|
||||
| Context revision | 1 |
|
||||
| Role ref | role:final-prototype-builder-r6 |
|
||||
| Role lifecycle | task-scoped |
|
||||
| Role profile | roles/final-prototype-builder-r6/ROLE.md |
|
||||
| 状态 | inbox |
|
||||
| 负责人 | final-prototype-builder-r6 |
|
||||
| 轮次 | 1/1 |
|
||||
| 验收结果 | PENDING |
|
||||
| Runtime requested | runtime=hapi; flavor=codex; model=gpt-5.6-sol; effort=xhigh; permission=yolo; visibility=visible |
|
||||
| Runtime observed | PENDING |
|
||||
| Runtime verification | PENDING |
|
||||
| Session ID | PENDING |
|
||||
| Runtime evidence | runtime-evidence.json PENDING |
|
||||
| Dispatch bootstrap | dispatch.md |
|
||||
| Dispatch message | NOT_SENT |
|
||||
| Identity ACK | PENDING |
|
||||
| 等待归属 | PMO spawn + ACK |
|
||||
|
||||
## State History
|
||||
|
||||
| Time | From -> To | Operator | Evidence | Next |
|
||||
|---|---|---|---|---|
|
||||
| 2026-08-11T13:50:00+08:00 | created -> inbox | PMO | Owner authorized final HTML output; clean fcc63a0 worktree | spawn and verify |
|
||||
@@ -0,0 +1,9 @@
|
||||
# Context Manifest: ABG-V2-REGION-ART-BINDING-R6
|
||||
|
||||
> Task ID: `ABG-V2-REGION-ART-BINDING-R6`
|
||||
> Revision: `1`
|
||||
> Mode: `balanced`
|
||||
|
||||
Read Role, PROJECT, this Goal, `docs/content/REGION_CATALOG.md`, the owned art
|
||||
catalog, validator contract/tool, and the Experience R5 report only. Search
|
||||
locally for existing ART-REG parsing before editing.
|
||||
@@ -0,0 +1,19 @@
|
||||
# Dispatch Bootstrap: ABG-V2-REGION-ART-BINDING-R6
|
||||
|
||||
| Field | Value |
|
||||
|---|---|
|
||||
| Task ID | ABG-V2-REGION-ART-BINDING-R6 |
|
||||
| Dispatch ID | dispatch:ABG-V2-REGION-ART-BINDING-R6:attempt-1 |
|
||||
| Role ref | role:region-art-binding-repairer-r6 |
|
||||
| Role profile | roles/region-art-binding-repairer-r6/ROLE.md |
|
||||
| Role lifecycle | task-scoped |
|
||||
| Team revision | rev-13 |
|
||||
| Goal ref | task:ABG-V2-REGION-ART-BINDING-R6 |
|
||||
| Context manifest | context.md |
|
||||
| Context revision | 1 |
|
||||
| Continuity | Fresh bounded Gate 8 repair; preserve R5 Gates 1-7. |
|
||||
| Session ID | PENDING |
|
||||
| Expected identity ACK | IDENTITY_READY dispatch_id=dispatch:ABG-V2-REGION-ART-BINDING-R6:attempt-1 role=role:region-art-binding-repairer-r6 team_revision=rev-13 goal=task:ABG-V2-REGION-ART-BINDING-R6 context_revision=1 |
|
||||
| Delivery | NOT_SENT |
|
||||
| Identity ACK | PENDING |
|
||||
| ACK evidence | PENDING |
|
||||
@@ -0,0 +1,40 @@
|
||||
# Goal: ABG-V2 Region Art Binding R6
|
||||
|
||||
> Stage: final pre-development design closure
|
||||
> Task ID: `ABG-V2-REGION-ART-BINDING-R6`
|
||||
> Baseline: `fcc63a0a3a18594a8cccdf9c7fe238ff9fda9a2b; branch=repair/abg-v2-region-art-r6; clean`
|
||||
> Fixed product source: `69f6715b6f47b507fb07436ee1edf77df7e5adab`
|
||||
> Frozen spec: `.agent-taskgraph/spec.md design-spec-r3`
|
||||
> Context manifest: `context.md`
|
||||
> Context revision: `1`
|
||||
> Legal terminal: **ABG-V2-REGION-ART-BINDING-R6 candidate ready** or **redesign required: <earliest boundary>**
|
||||
|
||||
## Objective
|
||||
|
||||
Close only Experience R5 Gate 8. Bind each `ART-REG-01..08` production package
|
||||
to exactly one `RG-01..08` content region, align biome/landmark/palette/hazard
|
||||
briefs with the content authority, and make missing, duplicate, wrong-ID or
|
||||
semantically conflicting bindings fail the deterministic design validator.
|
||||
|
||||
## Writes
|
||||
|
||||
- `docs/presentation/ART_ASSET_AND_ANIMATION_CATALOG.md`
|
||||
- `docs/reviews/DESIGN_VALIDATION_CONTRACT.md`
|
||||
- `tools/validate_predevelopment_design.py`
|
||||
|
||||
## Acceptance
|
||||
|
||||
- Exact bijection `RG-01..08 <-> ART-REG-01..08`; names and briefs match `REGION_CATALOG.md`.
|
||||
- Existing art totals, profession bindings, page counts and all unrelated rows remain unchanged.
|
||||
- Validator compile, self-test, full text and repeated JSON pass with zero errors and byte-identical JSON.
|
||||
- At least four isolated negative cases reject missing mapping, wrong RG ID, duplicate RG target and a mismatched region brief.
|
||||
- Focused commit is pushed; branch tracks upstream and worktree is clean.
|
||||
|
||||
## Frozen
|
||||
|
||||
No content/product/UX/audio/prototype edits, new art, paid generation, engine,
|
||||
packaging or release. Preserve R5 Gates 1-7 and stop after one candidate.
|
||||
|
||||
- Role ref: `role:region-art-binding-repairer-r6`
|
||||
- Worktree: `/Users/wusumac/Documents/game/tmp/aetherbound-guild-worktrees/repair-region-art-r6`
|
||||
- Runtime: HAPI Codex `gpt-5.6-sol / xhigh / yolo`, PENDING
|
||||
@@ -0,0 +1,31 @@
|
||||
# Ledger: ABG-V2-REGION-ART-BINDING-R6
|
||||
|
||||
| Field | Value |
|
||||
|---|---|
|
||||
| 任务 ID | ABG-V2-REGION-ART-BINDING-R6 |
|
||||
| Goal ref | task:ABG-V2-REGION-ART-BINDING-R6 |
|
||||
| Goal current path | queue/inbox/ABG-V2-REGION-ART-BINDING-R6/goal.md |
|
||||
| Context manifest | context.md |
|
||||
| Context revision | 1 |
|
||||
| Role ref | role:region-art-binding-repairer-r6 |
|
||||
| Role lifecycle | task-scoped |
|
||||
| Role profile | roles/region-art-binding-repairer-r6/ROLE.md |
|
||||
| 状态 | inbox |
|
||||
| 负责人 | region-art-binding-repairer-r6 |
|
||||
| 轮次 | 1/1 |
|
||||
| 验收结果 | PENDING |
|
||||
| Runtime requested | runtime=hapi; flavor=codex; model=gpt-5.6-sol; effort=xhigh; permission=yolo; visibility=visible |
|
||||
| Runtime observed | PENDING |
|
||||
| Runtime verification | PENDING |
|
||||
| Session ID | PENDING |
|
||||
| Runtime evidence | runtime-evidence.json PENDING |
|
||||
| Dispatch bootstrap | dispatch.md |
|
||||
| Dispatch message | NOT_SENT |
|
||||
| Identity ACK | PENDING |
|
||||
| 等待归属 | PMO spawn + ACK |
|
||||
|
||||
## State History
|
||||
|
||||
| Time | From -> To | Operator | Evidence | Next |
|
||||
|---|---|---|---|---|
|
||||
| 2026-08-11T13:50:00+08:00 | created -> inbox | PMO | Experience R5 Gate 8 FAIL; clean fcc63a0 worktree | spawn and verify |
|
||||
@@ -6,11 +6,11 @@
|
||||
| Team revision | rev-12 |
|
||||
| Origin | staffing:ABG-V2-EXPERIENCE-REVIEW-R5-A2 |
|
||||
| 生命周期 | task-scoped |
|
||||
| 状态 | assigned |
|
||||
| 状态 | retired |
|
||||
| 核心职责 | Independently verify fixed-source comprehension, page coverage, visual/audio feasibility, accessibility and originality |
|
||||
| 负责范围 | read-only fixed source and reviewer-owned temporary evidence |
|
||||
| 明确不负责 | Repository writes, repair, HTML, runtime product work, media, packaging or release |
|
||||
| 当前 Goal | task:ABG-V2-EXPERIENCE-REVIEW-R5 |
|
||||
| 当前 Session ID | 2392ec4d-83e8-4df4-b06e-0a7d3fa8167b |
|
||||
| 连续性记录 | Fresh replacement; attempt-1 is immutable INVALID environment history and cannot supply judgment. |
|
||||
| 最后更新 | 2026-08-11T13:25:00+08:00 / PMO |
|
||||
| 连续性记录 | Fresh replacement; Gates 1-7 PASS, Gate 8 FAIL on missing/conflicting region-to-art binding; session archived. |
|
||||
| 最后更新 | 2026-08-11T13:48:00+08:00 / PMO |
|
||||
|
||||
@@ -0,0 +1,16 @@
|
||||
# Role: Final Prototype Builder R6
|
||||
|
||||
| 字段 | 值 |
|
||||
|---|---|
|
||||
| Role ID | final-prototype-builder-r6 |
|
||||
| Team revision | rev-13 |
|
||||
| Origin | staffing:final-design-package-closure-r6 |
|
||||
| 生命周期 | task-scoped |
|
||||
| 状态 | reserved |
|
||||
| 核心职责 | Build the owner-facing final landscape HTML design prototype from current authorities |
|
||||
| 负责范围 | `prototype/site/`, `prototype/gallery/`, `tools/build_gallery_bundle.py`, `README.md`, `docs/prototype/INTERACTIVE_PROTOTYPE_SPEC.md` |
|
||||
| 明确不负责 | Product/content/presentation authority changes, paid media, engine runtime, packaging or release |
|
||||
| 当前 Goal | task:ABG-V2-FINAL-PROTOTYPE-R6 |
|
||||
| 当前 Session ID | PENDING |
|
||||
| 连续性记录 | Replaces the superseded 82-screen coverage audit with current 50-state authority. |
|
||||
| 最后更新 | 2026-08-11T13:50:00+08:00 / PMO |
|
||||
@@ -0,0 +1,16 @@
|
||||
# Role: Region Art Binding Repairer R6
|
||||
|
||||
| 字段 | 值 |
|
||||
|---|---|
|
||||
| Role ID | region-art-binding-repairer-r6 |
|
||||
| Team revision | rev-13 |
|
||||
| Origin | staffing:final-design-package-closure-r6 |
|
||||
| 生命周期 | task-scoped |
|
||||
| 状态 | reserved |
|
||||
| 核心职责 | Repair exact content-region to art-production binding and its semantic validator |
|
||||
| 负责范围 | `docs/presentation/ART_ASSET_AND_ANIMATION_CATALOG.md`, `docs/reviews/DESIGN_VALIDATION_CONTRACT.md`, `tools/validate_predevelopment_design.py` |
|
||||
| 明确不负责 | Product mechanics, content catalog edits, UI prototype, media generation, engine, packaging or release |
|
||||
| 当前 Goal | task:ABG-V2-REGION-ART-BINDING-R6 |
|
||||
| 当前 Session ID | PENDING |
|
||||
| 连续性记录 | Fresh bounded repair from Experience R5 Gate 8; Gates 1-7 remain accepted evidence. |
|
||||
| 最后更新 | 2026-08-11T13:50:00+08:00 / PMO |
|
||||
Reference in New Issue
Block a user