From 710dc6bd04216df8be8f233e9ab042bf04681e1f Mon Sep 17 00:00:00 2001 From: wusumac <736139669@qq.com> Date: Wed, 26 Aug 2026 10:57:22 +0800 Subject: [PATCH] docs: close M43 Guild View pilot --- CURRENT_CHECKPOINT.md | 24 +++++++++----------- docs/06_DEVELOPMENT_AND_REVIEW.md | 26 +++++++++++++++------- docs/plans/M43_GUILD_PAGE_VIEW_REFACTOR.md | 9 ++++---- 3 files changed, 33 insertions(+), 26 deletions(-) diff --git a/CURRENT_CHECKPOINT.md b/CURRENT_CHECKPOINT.md index 64a00d8e..fe362fc3 100644 --- a/CURRENT_CHECKPOINT.md +++ b/CURRENT_CHECKPOINT.md @@ -13,19 +13,17 @@ ## Current State -- Stage: `M43_GUILD_PAGE_VIEW_REFACTOR` -- Active implementation step: `M43-D` (`IN_PROGRESS`). M42 is complete at - source `975c77d`; its source-bound View contract, controller/runtime/route - regressions, DEV-3 candidate, full MVP first-cycle audit and four-fixture - Contract Choice visual equivalence all pass with strict diagnostics `0` and - exact-once markers. Evidence is recorded in - `docs/runtime/M42_CONTRACT_CHOICE_PAGE_VIEW_VISUAL_AUDIT.md`. - M43-A and M43-B are complete; M43-C focused verification, DEV-3 candidate, - full MVP first-cycle audit and Guild capture equivalence all pass at source - `5220acb`. Evidence is recorded in - `docs/runtime/M43_GUILD_PAGE_VIEW_VISUAL_AUDIT.md`. M43-D is the sole active - handoff step under the durable plan - `docs/plans/M43_GUILD_PAGE_VIEW_REFACTOR.md`. +- Stage: `M43_GUILD_PAGE_VIEW_REFACTOR` (`COMPLETE`; no later migration active) +- Active implementation step: none. M43-D closes at source `ba03a74`; M43-A + activation, M43-B passive View extraction and M43-C source-bound verification + all pass. The Guild View contract, M20 controller/runtime, DEV-3 regressions, + HUB-001 candidate, full MVP first-cycle audit and four-fixture capture + equivalence are recorded in + `docs/runtime/M43_GUILD_PAGE_VIEW_VISUAL_AUDIT.md`, with strict diagnostics + `0`, exact-once required markers, parsed touch and owned workspace/process + cleanup. The durable plan + `docs/plans/M43_GUILD_PAGE_VIEW_REFACTOR.md` is complete; no later View + migration is activated. `M40_RECRUIT_REVIEW_PAGE_VIEW_REFACTOR` is complete. It froze the SHP-002 Recruit Review stopping point, Controller/ViewData boundary, static master, exact fact and command nodes, approved invisible Settings hit area, diff --git a/docs/06_DEVELOPMENT_AND_REVIEW.md b/docs/06_DEVELOPMENT_AND_REVIEW.md index 83264a2c..51852653 100644 --- a/docs/06_DEVELOPMENT_AND_REVIEW.md +++ b/docs/06_DEVELOPMENT_AND_REVIEW.md @@ -10,12 +10,12 @@ Complete-game Goal, hand-drawn repair boundary, ordered implementation plan, roa ## Repository Reset And Page Production Baseline -> Status: `IN_PROGRESS / M43_GUILD_PAGE_VIEW_REFACTOR` -> Active step: `M43-D` (handoff). M42-D is closed at source `975c77d`. -> M43-A, M43-B and M43-C are complete at the source-bound Guild View -> extraction source `5220acb`; the source-bound audit is recorded in -> `docs/runtime/M43_GUILD_PAGE_VIEW_VISUAL_AUDIT.md`. M43-D is the sole active -> handoff step; no later migration is active. +> Status: `COMPLETE / M43_GUILD_PAGE_VIEW_REFACTOR` +> Active step: none. M43-D closes at source `ba03a74`. M43-A, M43-B and M43-C +> are complete at the source-bound Guild View extraction source `5220acb`; the +> source-bound audit is recorded in +> `docs/runtime/M43_GUILD_PAGE_VIEW_VISUAL_AUDIT.md`. No later migration is +> active. > M41-D is closed at source `b88b211`; M41-C is closed with source-bound verification and > four-fixture visual equivalence. M41-B is closed at source `9a440b3`; M40-D is closed at source > `9da7cac`; M39-D is closed at source `cf14bc8`. M32-D is @@ -4069,5 +4069,15 @@ they are not duplicated here. corrected M43 candidate are byte-identical with zero decoded-pixel differences. The four-fixture family preserves the two blocking `100%` fixtures and two retained `130%` supplemental fixtures. -- M43-D is now the sole active handoff step. No gameplay, economy, Save, - packaging or release work is authorized by this milestone. +- M43-D is complete at source `ba03a74`; the Guild View pilot is closed. + No gameplay, economy, Save, packaging or release work is authorized by this + milestone, and no later migration is active. + +### 2026-08-26 - M43 Guild View Pilot Closed + +- M43-D closes at source `ba03a74`. The durable plan + `docs/plans/M43_GUILD_PAGE_VIEW_REFACTOR.md` and checkpoint now mark M43 + `COMPLETE` with no later migration active. +- `ABG M43 GUILD VIEW PILOT COMPLETE` is the handoff record. The accepted + Guild composition and all application/domain boundaries remain unchanged; + future page migrations require a separate owner-authorized plan. diff --git a/docs/plans/M43_GUILD_PAGE_VIEW_REFACTOR.md b/docs/plans/M43_GUILD_PAGE_VIEW_REFACTOR.md index af5d09b2..937650c5 100644 --- a/docs/plans/M43_GUILD_PAGE_VIEW_REFACTOR.md +++ b/docs/plans/M43_GUILD_PAGE_VIEW_REFACTOR.md @@ -3,7 +3,7 @@ ## Status - Plan: `M43_GUILD_PAGE_VIEW_REFACTOR` -- Status: `IN_PROGRESS` +- Status: `COMPLETE` - Activated: 2026-08-26 - Baseline: `975c77d` (`M42_CONTRACT_CHOICE_VIEW_PILOT_COMPLETE`) - Owner authorization: continuation of the Owner-authorized layered Passive @@ -149,7 +149,7 @@ owned workspace/process cleanup. The four normal Guild capture fixtures are byte- and decoded-pixel-identical to the M43-A baseline (zero differing pixels). -### M43-D — Handoff (`IN_PROGRESS`) +### M43-D — Handoff (`COMPLETE`) - Record source-bound evidence in `docs/runtime/M43_GUILD_PAGE_VIEW_VISUAL_AUDIT.md`. @@ -158,9 +158,8 @@ pixels). outside this plan. - Update the checkpoint and development ledger, then push the focused closure. -M43-C evidence is complete. M43-D is now the sole active step for the -bounded handoff, checkpoint and ledger closure. No later migration is active -until this handoff is committed. +Closure: source `ba03a74` records the source-bound audit, checkpoint and +ledger closure. M43 is complete; no later migration is active. ## Frozen scope