diff --git a/.agent-taskgraph/STATUS.md b/.agent-taskgraph/STATUS.md index 7dad6081..dc2e8dfb 100644 --- a/.agent-taskgraph/STATUS.md +++ b/.agent-taskgraph/STATUS.md @@ -7,7 +7,7 @@ - Baseline at formation: clean worktree; formation source `894c6ed4`; current local HEAD is the M102 hash-closure worktree (not pushed) - Completed handoffs: T-001 authority audit; T-002 QA/evidence baseline. - Completed tasks: T-006 current-build smoke at `HEAD` (PASS); T-007 current-HEAD owner handoff video (PASS). -- Current active gate: M106 BAT-002 owner-gate audit, P1 IN_PROGRESS. M105 is +- Current active gate: M106 BAT-002 owner-gate audit, P2 IN_PROGRESS. M105 is handoff complete at the machine/agent-review boundary. P1 aligned enemy authoring to the formal `docs/02` §8.1 `offer_level + risk` model; P2 carries `market_index` and `risk` from the diff --git a/CURRENT_CHECKPOINT.md b/CURRENT_CHECKPOINT.md index a09b766d..0986e326 100644 --- a/CURRENT_CHECKPOINT.md +++ b/CURRENT_CHECKPOINT.md @@ -11,11 +11,11 @@ - Program Goal, active repair contract, implementation plan and ledger: `docs/06_DEVELOPMENT_AND_REVIEW.md` -## Active Plan (M106 BAT-002 Owner-Gate Audit — P1 IN_PROGRESS) +## Active Plan (M106 BAT-002 Owner-Gate Audit — P2 IN_PROGRESS) - Durable plan: `docs/plans/M106_BAT002_OWNER_GATE_AUDIT.md`. -- State (2026-09-21): **P1 IN_PROGRESS**. The package closes the stale M104 - control-plane wording, then refreshes BAT-002 normal-render evidence at the +- State (2026-09-21): **P1 COMPLETE; P2 IN_PROGRESS**. The package closed the + stale M104 control-plane wording and now refreshes BAT-002 normal-render evidence at the current source boundary and separates machine/agent review from Owner-only comprehension, feel, listening and fun gates. Gameplay, balance, economy, content, Save, routing and media production remain frozen. diff --git a/docs/plans/M106_BAT002_OWNER_GATE_AUDIT.md b/docs/plans/M106_BAT002_OWNER_GATE_AUDIT.md index c199d571..3636a0e7 100644 --- a/docs/plans/M106_BAT002_OWNER_GATE_AUDIT.md +++ b/docs/plans/M106_BAT002_OWNER_GATE_AUDIT.md @@ -39,7 +39,7 @@ the Owner gate. Exactly one step may be `IN_PROGRESS`. -1. **P1 — Control-plane closure and capture contract (IN_PROGRESS)** +1. **P1 — Control-plane closure and capture contract (COMPLETE, 2026-09-21)** - close the stale M104 `P2 IN_PROGRESS`/`P3 PENDING` wording as historical evidence closed at the product-authority boundary; - activate this plan in `CURRENT_CHECKPOINT.md` and `.agent-taskgraph/STATUS.md`; @@ -47,7 +47,7 @@ Exactly one step may be `IN_PROGRESS`. - Acceptance: one active plan, one `IN_PROGRESS` step, frozen scope recorded, and a focused docs commit. -2. **P2 — Current BAT-002 render audit (PENDING)** +2. **P2 — Current BAT-002 render audit (IN_PROGRESS)** - run the existing source-bound ten-state BAT-002 capture at `760x360`, `844x390`, and `1280x720` for `zh_CN`/`en` fixtures; - inspect static ownership, neutral dynamic state and final composite at