M42 Contract Choice Page View Refactor
Status
- Plan:
M42_CONTRACT_CHOICE_PAGE_VIEW_REFACTOR - Status:
COMPLETE - Activated: 2026-08-26
- Baseline:
1eea779(M41_MARKET_PAGE_VIEW_PILOT_COMPLETE) - Owner authorization: continuation of the Owner-authorized layered Passive View + Presenter/ViewData + Domain/Application Service architecture. The next extraction is the existing M19 Contract Choice surface, before the larger Guild surface.
Objective
Extract the first-cycle Contract Choice page from entry_shell.gd into a
passive, UI-only ABGContractChoicePageView while preserving the current
framed composition, Company portraits, First Windglass Crossing facts, four
difficulty options, local selection, Cancel-to-Guild behavior, one-receipt
Contract creation boundary and normal 100% output.
This is a structural View migration, not a Contract/economy, Guild, Market, Save, localization or visual redesign.
Target boundary
EntryShell / composition root
-> ContractChoicePageController.snapshot()
-> presentation-ready ViewData
-> ABGContractChoicePageView.render(ViewData)
-> explicit View intents
-> EntryShell application command boundary
-> existing difficulty / Back / create_contract commands
M42-A — Architecture contract and inventory (COMPLETE)
Freeze the current Contract Choice stopping point before product code changes:
ContractChoiceLayout,ContractChoiceBody,ContractBoardScene,ContractCompanyScene,ContractCompanyMember_0/1,ContractReview,ContractDifficultySegments,ContractDifficultyWayfinder,ContractDifficultyStandard,ContractDifficultyStormbound,ContractDifficultyIronOath,ContractDifficultyCopy,ContractCreationFacts,ContractNotice,ContractChoiceFooter,ContractCancelandContractConfirmare the frozen semantic nodes.- The View receives copied
ContractChoicePageController.snapshot()data: Company/recruit presentation, route title/copy, starting Coin, Line capacity, 3/4/3 Market counts, localized difficulty options, selected difficulty and Confirm eligibility. - The View emits only explicit
select_difficulty,confirmandbackintents. No new visible Settings control is introduced by this milestone; existing Settings/context behavior remains outside the page extraction unless the inventory finds an already-approved hit area. GuildContractService.create_contractremains the only transaction and persistence authority. Difficulty selection is local and must not mutate Company, Coin or Contract state; Cancel returns to Guild without a receipt.- Forbidden View dependencies are GuildContractService, persistence,
RuntimeContentRegistry, compatibility facade,
current_screenand EntryShell globals. - The normal
100%equivalence target is the existing M19 Contract Choice capture family at760x360/zh_CN,844x390/en,1280x720/zh_CNand1280x720/en;130%remains non-blocking.
Activation baseline: source-bound attempt
m42-contract-choice-baseline/20260826T011055Z-61940 passes
ABG_M19_CONTRACT_CHOICE_CONTROLLER_OK, ABG_DEV3_GUILD_OK and
ABG_M19_CONTRACT_CHOICE_CAPTURE_OK exactly once with strict diagnostics 0,
four normal capture frames and owned cleanup. Evidence archive SHA-256:
be4bd5ea328abde9516b6688cd7e9db3291e239d216c10421c838236f5d52e45.
M42-A is complete at the activation boundary. The current Contract Choice composition, focus/touch inventory, copied Controller snapshot, explicit three-intent boundary, invalid/missing Company fallback and Guild -> Contract Choice -> Market route are frozen without Runtime product changes.
Acceptance for M42-A
- The current
show_contract_choice()node tree, focus order, touch targets, invalid/missing Company fallback and Guild -> Contract Choice -> Market route are recorded before Runtime changes. - Existing markers remain green:
ABG_M19_CONTRACT_CHOICE_CONTROLLER_OK,ABG_DEV3_GUILD_OK,ABG_DEV3_MARKET_OKandABG_MVP_FIRST_CYCLE_AUDIT_OK. - A focused activation commit is pushed before M42-B product code.
Later steps
M42-B — Passive View extraction (COMPLETE)
- Add
runtime/entry/views/contract_choice_page_view.gdand an isolated View contract test. - Move only Contract Choice node construction/presentation into the View; keep Controller, GuildContractService, persistence and route semantics in their existing boundaries.
- Translate deferred difficulty/confirm/back intents in EntryShell.
Closure: source 885506f adds ABGContractChoicePageView, mounts it from
EntryShell, removes the former Contract Choice UI builders and translates only
the deferred difficulty/confirm/back intents. The isolated View contract,
M19 controller, DEV-3 Guild flow and four normal capture fixtures pass; the
captured frames are byte-equivalent to the M42 activation baseline.
M42-C — Focused verification (COMPLETE)
- Run the View contract, M19 controller, DEV-3 Guild/Market/Hire regressions,
source-bound DEV-3 candidate and full MVP audit with strict diagnostics
0. - Compare normal Contract Choice captures with the M19 baseline at all four required fixtures and confirm byte-equivalence.
Closure: source da94e8a passes the isolated View contract, M19 controller,
DEV-3 Guild/Market/Hire regressions, source-bound DEV-3 candidate and full MVP
first-cycle audit with strict diagnostics 0, exact-once markers and owned
cleanup. The four normal 100% Contract Choice captures are byte-equivalent
to the M19 baseline. Evidence is recorded in
docs/runtime/M42_CONTRACT_CHOICE_PAGE_VIEW_VISUAL_AUDIT.md.
M42-D — Handoff (COMPLETE)
- Record source-bound evidence in
docs/runtime/M42_CONTRACT_CHOICE_PAGE_VIEW_VISUAL_AUDIT.md. - Close only Contract Choice. Guild, Company/Roster, Battle, Economy, Save, packaging and release remain outside this plan.
- Update the checkpoint and development ledger, then push the focused closure.
Closure: source da94e8a records the source-bound audit, strict diagnostics,
four-fixture byte-equivalence and bounded scope. M42 is complete; Contract
Choice is now a passive View and no later migration is activated by this
plan.
Frozen scope
- No GuildContractService, Contract/economy, Company, Market, Hire, Battle, Save or localization semantic changes.
- No visible visual redesign, asset generation or static-master editing.
- No mass rewrite of
entry_shell.gd, global event bus or binding layer. - No deletion or staging of compatibility/history files,
.uid,.importorprototype_incremental/. - No packaging, iOS export, signing, deployment, store or release work.
Final handoff
ABG M42 CONTRACT CHOICE VIEW PILOT COMPLETE