ABG MVP Lead Team Status
- Team:
ABG-MVP-LEAD-20260918 - Lifecycle:
reviewing - Lead/Integrator: current primary HAPI session
- Current branch:
agent/abg-p91-runtime-foundation - Baseline at formation: clean worktree; formation source
894c6ed4; current local HEAD is the M102 hash-closure worktree (not pushed) - Completed handoffs: T-001 authority audit; T-002 QA/evidence baseline.
- Completed tasks: T-006 current-build smoke at
HEAD(PASS); T-007 current-HEAD owner handoff video (PASS). - Current active gate: M105 P1 (rank-authority alignment) is in progress.
The Owner selected the formal
docs/02§8.1offer_level + riskmodel. P1 is limited to the enemy authoring boundary and a focused deterministic proof; bridge/probe integration is M105 P2 and is not started yet. Gameplay, economy, content, Save, UI, art, audio, and owner review gates remain frozen. M104 P1 repaired the encounter class authority and passed both its focused marker and the M60 regression. The repaired density sweep reportswall_late=7; isolated enemy-count candidates reduce it to 4 and then 1, but high-region late clear remains mostly 0–25%. The level-offset A/B is neutral; a region cap alone giveswall_late=5, while the labelled count+cap combination is rejected fortrivial_late=3and an R3 zero. The higher-sample region×late-round matrix is complete (192 battles, n=8 per cell) and still fails the late-clear target. Authority review confirms it is a standard-ladder, not economic-shape, proxy. The read-only formula audit is complete: 72/72 cells differ, with R12 ordinary rank 4 versus current passed levels 10–24 plus region pressure. M104 remains historical evidence, not an approved production balance change. M60/P10.0 first-cycle behaviour remains frozen. - Current blocker: Owner playtest verdict, human listening, six-question comprehension and duplicate-portrait decision remain open downstream gates; do not claim MVP visual readiness from automation alone.
- Runtime note: Product/System, UI, and QA are ordinary visible HAPI OpenCode sessions; this workflow does not use Team mode or native sub-agents.
- Next event: finish M105 P1, then open only its P2 bridge/probe step after the focused marker is green. Compress the remaining Owner gate to the captured BAT-002 states and the six-question comprehension/listening sheet. Do not turn historical proxy numbers into production balance.