docs(runtime): close battle opening controller pilot

Co-Authored-By: Codex <noreply@anthropic.com>
This commit is contained in:
2026-08-25 18:04:34 +08:00
co-authored by Codex
parent 3a0c06627e
commit 59cba62a2a
2 changed files with 42 additions and 24 deletions
+30 -19
View File
@@ -13,19 +13,22 @@
## Current State
- Stage: `M25_BATTLE_OPENING_CONTROLLER_PILOT`
- Active implementation step: `M25-D` (`IN_PROGRESS`) — final source-bound
verification and handoff after the additive Battle Opening controller and
View integration boundaries passed. M25-A is complete at source `c3ae95c`;
M25-B is complete at source `7b084d5`; M25-C is complete at source
`eb74d76` with the compatibility/touch repair at `402145e`. M24-D is
- Stage: `M25_BATTLE_OPENING_CONTROLLER_PILOT_COMPLETE`
- Active implementation step: none. M25-D is complete at source `3a0c066`:
the focused controller/View boundaries and the full source-bound MVP
first-cycle audit pass with exact-once markers, strict diagnostics `0`,
128 normal `100%` frames and owned workspace/process cleanup. M25-A is
complete at source `c3ae95c`; M25-B is complete at source `7b084d5`; M25-C
is complete at source `eb74d76` with the compatibility/touch repair at
`402145e`. M24-D is
complete at source `9518e2e`: focused Risk Commitment/controller
verification, normal captures and the full MVP handoff pass with exact-once
markers, strict diagnostics `0` and owned workspace/process cleanup. M24-A
is complete at source `e8825f7`; M24-B is complete at source `3e80083`; M24-C
is complete at source `9518e2e`. M23-D is complete at source `8ac91f2`.
(M14 repository cleanup and M15 Runtime Foundation remain complete.)
- Active durable plan: `docs/plans/M25_BATTLE_OPENING_CONTROLLER_PILOT.md`
- Latest durable plan (complete):
`docs/plans/M25_BATTLE_OPENING_CONTROLLER_PILOT.md`
- M15 scope was limited to an additive shared service/UI foundation and a
Settings integration pilot. No mass page rewrite, gameplay change, asset
generation, cleanup, packaging or release work was authorized by this plan.
@@ -151,19 +154,25 @@
`8129815eef0e8dfe57a117d70dadc15c52a3fac376ec28a559a4df32d0a7182e`).
- M25 is the bounded Battle Opening Controller migration. Its activation plan
is `docs/plans/M25_BATTLE_OPENING_CONTROLLER_PILOT.md`; `M25-A` is complete
at source `c3ae95c`, `M25-B` at `7b084d5`, and `M25-C` at `eb74d76` with the
pushed repair source `402145e`. The focused source-bound attempt
at source `c3ae95c`, `M25-B` at `7b084d5`, `M25-C` at `eb74d76` with the
pushed repair source `402145e`, and `M25-D` closes at `3a0c066`. The focused
source-bound attempt
`/private/tmp/aetherbound-guild-test-evidence/m25-battle-opening-focused/20260825T095412Z-44836`
passes exact-once `ABG_M25_BATTLE_OPENING_CONTROLLER_OK`,
`ABG_DEV5_BATTLE_OPENING_OK` and `ABG_DEV5_CANDIDATE_SUITE_OK`, strict
diagnostics `0`, 24 normal Battle-cycle frames and owned workspace/process
cleanup (archive SHA-256
`a921699aa0aa8b64db3e68173decf26854f1704c464cc6d8b5b5e21c623ecaa5`).
The scope remains limited to copied battle/receipt/Party/enemy view data,
opening-state classification and Start Observation eligibility; accepted
BAT-001 composition, phase-zero semantics, BAT-002 handoff and persistence
remain frozen. M25-D is active only for the final full MVP audit and
handoff.
`a921699aa0aa8b64db3e68173decf26854f1704c464cc6d8b5b5e21c623ecaa5`). The
full source-bound MVP first-cycle audit
`/private/tmp/aetherbound-guild-test-evidence/m25-mvp-audit/20260825T100014Z-50845`
passes exact-once `ABG_MVP_FIRST_CYCLE_AUDIT_OK` with 180 evidence files,
128 normal `100%` frames across `zh_CN`/`en` and `760x360`, `844x390`,
`1280x720`, strict diagnostics `0`, parsed touch coverage, restart-to-Market
and owned workspace/process cleanup (archive SHA-256
`8ceb63b04bc2e5b11b297b31d72d92b8a880f45564e7db13c83bdf524cea70b1`). The
accepted BAT-001 composition, phase-zero semantics, BAT-002 handoff and
persistence remain frozen. There is no active next implementation step; a
later architecture seam or product change requires a new durable plan.
- M16-B is complete at source `c8af889`: `ABGCompanyPageController` and
`ABG_M16_COMPANY_PAGES_OK` centralize copied roster/detail facts and
dismissal eligibility without Godot-node or persistence dependencies.
@@ -1372,10 +1381,12 @@ source `9518e2e`; its activation boundary is source `e8825f7`, controller
source `3e80083`, and the accepted RSK-002 View integration, focused candidate
and full source-bound MVP audit all pass with exact-once markers, strict
diagnostics `0`, 24 focused normal `100%` frames, 128 normal MVP frames and
owned workspace cleanup. M25 Battle Opening Controller Pilot has completed
its activation, controller and View integration boundaries at `402145e`; the
focused source-bound candidate is green and M25-D remains active only for the
full MVP first-cycle audit and final handoff.
owned workspace cleanup. M25 Battle Opening Controller Pilot is complete at
source `3a0c066`; its activation, controller, View integration, focused
candidate and full MVP first-cycle audit all pass with exact-once markers,
strict diagnostics `0`, 128 normal MVP frames and owned workspace cleanup.
There is no active next implementation step; a later architecture seam or
product change requires a new durable plan.
Second-cycle systems/content, broader region/endgame production,
device/package/store/release and human comprehension/fun gates remain outside
this milestone and require their own explicitly activated durable plan.
@@ -3,7 +3,7 @@
## Status
- Plan: `M25_BATTLE_OPENING_CONTROLLER_PILOT`
- Status: `IN_PROGRESS`
- Status: `COMPLETE`
- Activated: 2026-08-25
- Baseline: `282b300` (`M24_RISK_COMMITMENT_CONTROLLER_PILOT_COMPLETE`)
- Owner authorization: the Owner authorized direct migration to the new code
@@ -125,7 +125,7 @@ Battle-cycle capture frames and owned workspace/process cleanup. Its archive
SHA-256 is
`a921699aa0aa8b64db3e68173decf26854f1704c464cc6d8b5b5e21c623ecaa5`.
### M25-D — Verification and handoff (`IN_PROGRESS`)
### M25-D — Verification and handoff (`COMPLETE`)
- Run the focused controller, BAT-001, BAT-002, Risk Commitment, Risk,
Readiness, Party, Guild, Market and Hire regressions.
@@ -133,9 +133,16 @@ SHA-256 is
- Run the full MVP first-cycle audit and require strict diagnostics `0`.
- Close with a focused pushed commit and update the checkpoint.
The focused controller/View and DEV-5 candidate boundaries are green. The
remaining stopping point is the source-bound full MVP first-cycle audit and
its checkpoint/closure commit; no new product scope is opened by that audit.
Closure: the source-bound full MVP first-cycle audit from source `3a0c066`
passes `ABG_MVP_FIRST_CYCLE_AUDIT_OK` exactly once with 180 evidence files,
128 normal `100%` frames across `zh_CN`/`en` and `760x360`, `844x390`,
`1280x720`, strict diagnostics `0`, parsed touch coverage, restart-to-Market
and owned workspace/process cleanup. The retained archive is
`/private/tmp/aetherbound-guild-test-evidence/m25-mvp-audit/20260825T100014Z-50845`
with archive SHA-256
`8ceb63b04bc2e5b11b297b31d72d92b8a880f45564e7db13c83bdf524cea70b1`.
M25 closes without changing BAT-001 presentation, phase-zero semantics,
BattleService handoff/receipt rules, persistence or any later page.
## Frozen Scope