ABG-V2-SYSTEMS-REVIEW-R5 Report
Reviewer terminal: ABG-V2-SYSTEMS-REVIEW-R5 FAIL: Gate 9 pacing-envelope contradiction
- Fixed source:
69f6715b6f47b507fb07436ee1edf77df7e5adab - Reviewer: HAPI
a0ea4f06-a73d-47c4-bc0d-dad36c6d735d(archived) - Clean immutable archive: tree
f9e8f4b9;293/293blobs - Validator:
cases=24,errors=0; deterministic JSON and five anti-dominance seeds passed
Gates 1-8 passed. The reviewer stopped at Gate 9 because its PMO-authored Goal
required 25-35 h / 60-80 h / roughly 100 h, while the frozen spec and fixed
product/economy authorities consistently require 15-25 h first clear and
60+ h mastery. All five calculated first-clear profiles (16.30, 19.50,
23.20, 22.00, 21.75 h) satisfy the actual frozen spec.
PMO classification: INVALID_REVIEW_CONTRACT, not a product-design failure.
Gate 10 mechanical catalog sampling was not reached. No repository write was
made by the reviewer.