docs: close M43 Guild View pilot
This commit is contained in:
+11
-13
@@ -13,19 +13,17 @@
|
||||
|
||||
## Current State
|
||||
|
||||
- Stage: `M43_GUILD_PAGE_VIEW_REFACTOR`
|
||||
- Active implementation step: `M43-D` (`IN_PROGRESS`). M42 is complete at
|
||||
source `975c77d`; its source-bound View contract, controller/runtime/route
|
||||
regressions, DEV-3 candidate, full MVP first-cycle audit and four-fixture
|
||||
Contract Choice visual equivalence all pass with strict diagnostics `0` and
|
||||
exact-once markers. Evidence is recorded in
|
||||
`docs/runtime/M42_CONTRACT_CHOICE_PAGE_VIEW_VISUAL_AUDIT.md`.
|
||||
M43-A and M43-B are complete; M43-C focused verification, DEV-3 candidate,
|
||||
full MVP first-cycle audit and Guild capture equivalence all pass at source
|
||||
`5220acb`. Evidence is recorded in
|
||||
`docs/runtime/M43_GUILD_PAGE_VIEW_VISUAL_AUDIT.md`. M43-D is the sole active
|
||||
handoff step under the durable plan
|
||||
`docs/plans/M43_GUILD_PAGE_VIEW_REFACTOR.md`.
|
||||
- Stage: `M43_GUILD_PAGE_VIEW_REFACTOR` (`COMPLETE`; no later migration active)
|
||||
- Active implementation step: none. M43-D closes at source `ba03a74`; M43-A
|
||||
activation, M43-B passive View extraction and M43-C source-bound verification
|
||||
all pass. The Guild View contract, M20 controller/runtime, DEV-3 regressions,
|
||||
HUB-001 candidate, full MVP first-cycle audit and four-fixture capture
|
||||
equivalence are recorded in
|
||||
`docs/runtime/M43_GUILD_PAGE_VIEW_VISUAL_AUDIT.md`, with strict diagnostics
|
||||
`0`, exact-once required markers, parsed touch and owned workspace/process
|
||||
cleanup. The durable plan
|
||||
`docs/plans/M43_GUILD_PAGE_VIEW_REFACTOR.md` is complete; no later View
|
||||
migration is activated.
|
||||
`M40_RECRUIT_REVIEW_PAGE_VIEW_REFACTOR` is complete. It froze the SHP-002
|
||||
Recruit Review stopping point, Controller/ViewData boundary, static master,
|
||||
exact fact and command nodes, approved invisible Settings hit area,
|
||||
|
||||
@@ -10,12 +10,12 @@ Complete-game Goal, hand-drawn repair boundary, ordered implementation plan, roa
|
||||
|
||||
## Repository Reset And Page Production Baseline
|
||||
|
||||
> Status: `IN_PROGRESS / M43_GUILD_PAGE_VIEW_REFACTOR`
|
||||
> Active step: `M43-D` (handoff). M42-D is closed at source `975c77d`.
|
||||
> M43-A, M43-B and M43-C are complete at the source-bound Guild View
|
||||
> extraction source `5220acb`; the source-bound audit is recorded in
|
||||
> `docs/runtime/M43_GUILD_PAGE_VIEW_VISUAL_AUDIT.md`. M43-D is the sole active
|
||||
> handoff step; no later migration is active.
|
||||
> Status: `COMPLETE / M43_GUILD_PAGE_VIEW_REFACTOR`
|
||||
> Active step: none. M43-D closes at source `ba03a74`. M43-A, M43-B and M43-C
|
||||
> are complete at the source-bound Guild View extraction source `5220acb`; the
|
||||
> source-bound audit is recorded in
|
||||
> `docs/runtime/M43_GUILD_PAGE_VIEW_VISUAL_AUDIT.md`. No later migration is
|
||||
> active.
|
||||
> M41-D is closed at source `b88b211`; M41-C is closed with source-bound verification and
|
||||
> four-fixture visual equivalence. M41-B is closed at source `9a440b3`; M40-D is closed at source
|
||||
> `9da7cac`; M39-D is closed at source `cf14bc8`. M32-D is
|
||||
@@ -4069,5 +4069,15 @@ they are not duplicated here.
|
||||
corrected M43 candidate are byte-identical with zero decoded-pixel
|
||||
differences. The four-fixture family preserves the two blocking `100%`
|
||||
fixtures and two retained `130%` supplemental fixtures.
|
||||
- M43-D is now the sole active handoff step. No gameplay, economy, Save,
|
||||
packaging or release work is authorized by this milestone.
|
||||
- M43-D is complete at source `ba03a74`; the Guild View pilot is closed.
|
||||
No gameplay, economy, Save, packaging or release work is authorized by this
|
||||
milestone, and no later migration is active.
|
||||
|
||||
### 2026-08-26 - M43 Guild View Pilot Closed
|
||||
|
||||
- M43-D closes at source `ba03a74`. The durable plan
|
||||
`docs/plans/M43_GUILD_PAGE_VIEW_REFACTOR.md` and checkpoint now mark M43
|
||||
`COMPLETE` with no later migration active.
|
||||
- `ABG M43 GUILD VIEW PILOT COMPLETE` is the handoff record. The accepted
|
||||
Guild composition and all application/domain boundaries remain unchanged;
|
||||
future page migrations require a separate owner-authorized plan.
|
||||
|
||||
@@ -3,7 +3,7 @@
|
||||
## Status
|
||||
|
||||
- Plan: `M43_GUILD_PAGE_VIEW_REFACTOR`
|
||||
- Status: `IN_PROGRESS`
|
||||
- Status: `COMPLETE`
|
||||
- Activated: 2026-08-26
|
||||
- Baseline: `975c77d` (`M42_CONTRACT_CHOICE_VIEW_PILOT_COMPLETE`)
|
||||
- Owner authorization: continuation of the Owner-authorized layered Passive
|
||||
@@ -149,7 +149,7 @@ owned workspace/process cleanup. The four normal Guild capture fixtures are
|
||||
byte- and decoded-pixel-identical to the M43-A baseline (zero differing
|
||||
pixels).
|
||||
|
||||
### M43-D — Handoff (`IN_PROGRESS`)
|
||||
### M43-D — Handoff (`COMPLETE`)
|
||||
|
||||
- Record source-bound evidence in
|
||||
`docs/runtime/M43_GUILD_PAGE_VIEW_VISUAL_AUDIT.md`.
|
||||
@@ -158,9 +158,8 @@ pixels).
|
||||
outside this plan.
|
||||
- Update the checkpoint and development ledger, then push the focused closure.
|
||||
|
||||
M43-C evidence is complete. M43-D is now the sole active step for the
|
||||
bounded handoff, checkpoint and ledger closure. No later migration is active
|
||||
until this handoff is committed.
|
||||
Closure: source `ba03a74` records the source-bound audit, checkpoint and
|
||||
ledger closure. M43 is complete; no later migration is active.
|
||||
|
||||